Automated sortation installation
AURON provides automated parcel sorting system installation for express logistics hubs and e-commerce fulfilment centres, including mechanical and electrical installation, conveyor integration and commissioning support.
Discuss a sorter projectInstall the equipment and manage the interfaces around it
Sortation systems bring mechanical assemblies, controls, scanning, electrical power, conveyors and building constraints into one commissioning path. AURON organises the field sequence around those dependencies.
We work with the equipment manufacturer and system integrator, keeping specialist responsibility with the responsible party while making the physical interfaces visible.
Installation capability across common sorter types
Cross-belt sorter installation
Tilt-tray sorter installation
Narrow-belt sorter installation
Wheel sorter installation
Modular belt sorter installation
Conveyor system installation
MANZUN
Explore sorting equipment and component capability from MANZUN.
Visit MANZUNParcel Sort Lab
Use independent sorter explainers and planning guides from Parcel Sort Lab.
Visit Parcel Sort LabParcel sorting installation: common questions
What does parcel sorter installation include?
The agreed scope can include equipment positioning, mechanical assembly, alignment, cable routing, power and control connections, conveyor interfaces and installation checks. Equipment supply and specialist controls responsibilities are agreed separately.
Which sorting systems can AURON install?
Installation capabilities cover cross-belt, tilt-tray, narrow-belt, wheel and modular belt sorters, together with conveyor systems. The equipment manufacturer's drawings and project scope determine the installation requirements.
Who leads commissioning?
The equipment supplier and system integrator lead their specialist tests. AURON supports field checks, I/O verification, defect correction and handover within the agreed installation boundary.
What is needed for an installation enquiry?
Share the equipment list, layout drawings, project location, target schedule, site access conditions and required mechanical and electrical scope. These inputs help define installation interfaces and preparation.
Read the sorter installation planning guide
Mechanical and electrical installation scopePlanning an installation, relocation or site upgrade?
Tell us what is moving, where the work takes place and the schedule you are working toward.