Define the required end condition

A move can mean simple physical relocation, restoration to the previous condition or a combined relocation and upgrade. Agree the required performance, documentation and acceptance boundary before dismantling begins.

Capture the existing condition

Create a controlled record of assemblies, orientation, cable identification, alignment references and visible defects. Match marking must remain understandable after packing and transport.

  • Approved equipment and utility isolation
  • Photographs and equipment identification
  • Cable, hose and interface schedules
  • Lift points, centre of gravity and handling limits

Prove the destination is ready

Check floor, access, utilities, foundations, clearance and maintenance space against the equipment that will actually arrive. A relocation schedule fails quickly when destination assumptions are left until unloading.

Plan reassembly and restart together

The dismantling order should support the future rebuild. Define alignment checks, reconnection verification, outstanding-change control and the commissioning sequence before the move.